Step-by-step flows
When to use Add more info
- Use it when you receive extra information for an existing draft, such as supplier notes, traveler preferences, updated route notes, included activities, or practical guidance.
- Use it when the information should be merged into the proposal draft, but is not mainly a day-order or date-change request.
- Use "Update program" instead when the request is mostly about moving days, changing dates, replacing activities, changing hotel nights, or revising routing logic.
Update the draft
- Open the trip in the editor.
- Click "Add more info".
- Paste the new information or upload a readable PDF.
- Click "Update trip with AI".
- Wait for the update to finish and read the summary of updated days, updated blocks, and added blocks.
Review before publishing
- Check the changed day text and any added blocks.
- Confirm that dates, prices, hotels, activities, locations, inclusions, and contact details are still correct.
- Open History if you need to restore the draft to the point before the AI update.
- Preview the traveler page and publish only after review.
Notes
- The tool saves a restore point before applying the AI update.
- AI can merge new details into a draft, but you remain responsible for checking client-facing facts before publishing.
- For ambiguous or high-risk changes, make a smaller request or update the draft manually.
